Non-curing Rubber Asphalt Waterproof Leakage Repair Coating
Main Application Areas:
| Performance Indicator | Specific Characteristics |
| Non-curing | Remains in a viscous gel state even after long-term exposure to air; solid content ≥98%~99.8% |
| Strong Self-healing Capability | Localized damage to the waterproof layer can be automatically repaired, maintaining the integrity of the waterproof system |
| Excellent Creep Resistance | High flexibility with elongation ≥800%, capable of accommodating substrate deformation and structural displacement |
| Superior Adhesion Performance | Can be applied on damp substrates; forms tight bonding with concrete, metal, SBS/APP membranes, and other materials |
| High & Low Temperature Resistance | Maintains high viscoelastic state within -20℃~70℃ range; retains good adhesion at -20℃ |
| Anti-water Migration | Forms a skin-like waterproof layer that prevents water from migrating within the waterproof system |
| Environmentally Safe | Solvent-free, no volatile emissions, non-toxic, odorless, and non-flammable |
| Construction Method | Description |
| Spray Application | Mechanical spraying, uniform thickness, high efficiency |
| Scrape Application | Manual scraping, suitable for detailed nodes |
| Grouting for Leakage Repair | Used for crack and leakage area repair |
1. Substrate Preparation → 2. Non-curing Coating Application → 3. Timely Membrane Laying → 4. Node Reinforcement → 5. Protective Layer Construction
| Key Point | Requirement |
| Substrate Condition | Moisture content ≤9%, solid, flat and free of standing water |
| Construction Temperature | Coating heating temperature: 140~175℃; ambient temperature ≥5℃ |
| Coating Thickness | Pure coating ≥2mm; composite system coating layer ≥1.5~2.5mm |
| Membrane Laying Timing | Complete membrane laying within 3 minutes after coating application |
| Membrane Overlap Treatment | Roll 2~3 times with a pressure roller of 50kg or more at the overlap joint |
Construction Methods:
Typical Construction Process (Composite Waterproofing System):
Key Construction Points:
![]()
![]()