Products
Home / Products / Polymer Modified Cement Waterproofing /

Flexible Rigid Composite Polymer Modified Cement Waterproofing TypeⅠ No Crack At -10℃

Flexible Rigid Composite Polymer Modified Cement Waterproofing TypeⅠ No Crack At -10℃

Brand Name: shhous
Model Number: Type I ,Type II ,Type III
MOQ: 1000kg
Price: USD 0.8‑1.1/kg
Supply Ability: 1000000kg per Month
Detail Information
Place of Origin:
Shandong, China
Certification:
ISO
Product Feature:
Combined Rigid-flexible Waterproof Performance
Solid Content:
≥70%
Product Composition:
Two-component, Liquid Component + Powder Component
Film Characteristic:
Forms Flexible Waterproof Film After Curing
Low-temperature Flexibility:
TypeⅠ No Crack At -10℃
Water Impermeability:
Waterproof At 0.3 MPa For 30 min
Application Method:
Brush, Roller And Trowel Application Available
Construction Substrate:
Applicable On Damp Substrate Without Standing Water
Packaging Details:
Pails+Bags
Highlight:

composite polymer modified cement waterproofing

,

composite acrylic modified cementitious waterproofing

,

flexible rigid polymer modified cement waterproofing

Product Description

Flexible Rigid Composite Js Waterproof Coating

Substrate Preparation

The substrate shall be sound, flat and clean. Remove laitance, dust, oil stains and loose layers. Repair holes and cracks in advance. Fully wet the substrate before construction, keep it damp without standing water. Clean and polish vulnerable details such as corners, pipe penetrations and construction joints.

Two‑component Mixing

Follow the mixing ratio strictly. Add liquid component first, then powder component. Electrically stir for 2‑3 minutes until smooth lump‑free slurry is obtained. Mix on‑demand and use within pot life. Do not re‑mix expired slurry by adding extra water.

Detail Reinforcement

Apply a thin coat of JS slurry on leakage‑prone areas such as pipe roots, wall‑penetrating pipes, corners, construction joints and post‑pouring belts. Lay non‑woven or glass‑fiber fabric for positions with large deformation. Proceed to large‑area construction after reinforcement layer is fully dried.

Multi‑coat Large‑area Application

Apply 2‑3 cross‑direction coats by brush, roller or trowel. Apply next coat only when previous coat is dry and non‑sticky. Apply successive coats in perpendicular directions. Strictly control total film thickness, ensure uniform coating without missing or accumulation.

Curing & Curing Period

Suitable construction temperature: 5‑35℃. Stop construction in rainy, snowy and windy conditions. Conduct natural curing after surface drying. Prevent rain wash and direct strong sunlight. Keep good ventilation for full cross‑linking and curing.

Finished‑product Protection & Subsequent Work

Avoid foot traffic, impact and water immersion during curing period. After the coating achieves full performance, plastering, mortar leveling, tile laying and backfilling can be carried out directly without extra interface treatment.

 

NO.Precautions 
1Construction temperature shall be 5‑35℃. Outdoor construction is prohibited under rainy, snowy, foggy and windy conditions.
2Substrate shall be sound and flat. Damp substrate is acceptable, but standing water is strictly forbidden.
3Strictly follow liquid‑powder mixing ratio. Do not change ratio arbitrarily, and avoid adding extra water to dilute slurry.
4Prepare slurry for immediate use. Finish application within pot life. Do not reuse expired slurry by adding water.
5Apply multiple thin coats. The next coat can only be applied after previous coat is dry and non‑sticky.
6Reinforcement treatment shall be done for vulnerable parts: corners, pipe roots and construction joints.
7Reinforcing non‑woven fabric or glass‑fiber mat is recommended for areas with large structural deformation.
8Type I product cannot bear long‑term direct UV exposure. Protective layer is mandatory for exposed application.
9Avoid rain scouring, strong sunlight exposure, impact and foot traffic during construction and curing.
10Do not carry out water immersion, backfilling or tiling before full curing of waterproof film.
11Clean mixing and application tools timely to prevent slurry hardening on equipment.
12Protect liquid component from freezing and powder component from moisture. Use within shelf‑life.

Flexible Rigid Composite Polymer Modified Cement Waterproofing TypeⅠ No Crack At -10℃