Products
Home / Products / PU Waterproof Coating /

High Elongation PU Waterproof Coating Two Component For Crack Bridging

High Elongation PU Waterproof Coating Two Component For Crack Bridging

Brand Name: shhous
Model Number: two‑component
MOQ: 1000kg
Price: USD 1.3‑1.5/kg
Supply Ability: 1000000kg per Month
Detail Information
Place of Origin:
Shandong, China
Certification:
ISO
Temperature/Humidity:
Construct At 5℃-35℃; Low Temp Slows Curing; Avoid Rainy And Dewy Days
Substrate:
Substrate Must Be Solid & Dry, Free Of Standing Water, Dust And Oil; Interface Treatment Required For Damp Surface
Ventilation:
Keep Ventilated, Avoid Inhaling Volatile Gas, Wear Protective Equipment
Application Method:
Cold‑applied By Troweling Or Brushing
Chemical Resistance:
Resistant To Water, Acid, Alkali And Salt Corrosion
Solid Content:
≥92 %
Surface Drying Time:
≤12 h Under Standard Condition
Through‑curing Time:
≤24 h Under Standard Condition
Packaging Details:
Metal Barrel
Highlight:

high elongation pu waterproof coating

,

pu waterproof coating two component

,

high elongation polyurethane waterproofing coating

Product Description

High-elongation Two-component Polyurethane Coating For Crack-bridging

 

Advantages for Bathroom

  1. High film elasticity: High tensile strength and elongation, resists thermal expansion‑contraction and micro‑cracks of substrate, prevents water‑leakage caused by floor slight deformation.
  2. Seamless waterproofing: Reactive liquid‑formed film fully covers corners, pipe roots and floor drains without joints, reduces leakage risk at high‑risk positions.
  3. Strong adhesion: Firm bonding to cement‑mortar substrate, less hollowing, blistering and delamination.
  4. Long‑term water immersion resistance: Stable performance under long‑time soaking, ideal for shower area waterproofing.
  5. Mildew & corrosion resistance: Adapt to hot‑humid bathroom environment, resist sewage corrosion.
  6. Excellent water‑pressure resistance: Dense film with strong impermeability to stop water seepage to lower floors.
  7. Good for detail treatment: Extra‑thick coating around pipe roots and floor drains to reinforce high‑leakage‑risk zones.
  8. High mechanical strength: Cured rubber‑like film resists impact, hard to damage during tile‑laying work.
No. Item Precautions
1 Substrate Substrate must be solid & dry, free of standing water, dust and oil; interface treatment required for damp surface
2 Mixing Ratio Weigh A & B strictly by weight ratio; wrong ratio causes uncured sticky or brittle film
3 Stirring Electrically stir 3-5min until uniform; poor mixing causes partial curing failure
4 Pot-life Use up within pot-life after mixing; discard gelled material, do not dilute with water
5 Coating Layers Apply thin multi-coats in cross directions; avoid heavy coat to prevent blistering & sagging
6 Temperature/Humidity Construct at 5℃-35℃; low temp slows curing; avoid rainy and dewy days

Application Method for Bathroom

  1. Substrate preparation: Keep bathroom floor & wall solid and flat. Remove dust, oil and loose mortar. Plug holes and repair cracks. Keep substrate dry without standing water.
  2. Detail reinforcement: Apply 1‑2 coats of two‑component polyurethane as extra layer for pipe roots, floor drains and corners, width ≥250mm per side. Proceed to main‑area construction after drying.
  3. Proportion & mixing: Weigh component A and B strictly by weight ratio. Electrically stir for 3‑5 minutes until uniform without particles. Use mixed material within pot‑life, do not dilute with water.
  4. Multi‑layer trowel application: Apply thin coats repeatedly; single heavy coat is forbidden. Apply next coat after previous coat dries, brush in cross directions. Total film thickness for floor ≥1.5mm; shower‑zone wall height ≥1.8m, other walls ≥300mm.
  5. Curing: Natural full curing. Forbid treading and water contact during curing period.
  6. Water‑storage test: Carry out 24‑48 hours water‑storage test after full curing. Pass test if no leakage downstairs.
  7. Protective layer & tile work: Apply cement‑mortar protective layer after qualified water test, then lay ceramic tiles.

High Elongation PU Waterproof Coating Two Component For Crack Bridging