Products
Home / Products / Crystalline Waterproofing Coating /

Cementitious Capillary Crystalline Waterproofing Coating Manufacturer China No Lumps

Cementitious Capillary Crystalline Waterproofing Coating Manufacturer China No Lumps

Brand Name: shhous
Model Number: C
MOQ: 1000kg
Price: USD 0.5‑0.8/kg
Supply Ability: 1000000kg per Month
Detail Information
Place of Origin:
Shandong, China
Certification:
ISO
Impermeability Capacity:
High Impermeability And High Water Pressure Resistance
Weather Resistance:
Resistant To Groundwater Corrosion And Aging
Subsequent Construction:
Direct Plastering And Tiling After Curing
Film Feature:
No Film Blistering, Peeling Or Delamination
Construction Method:
Easy Application By Brush Or Trowel
Appearance:
Uniform, No Lumps
Moisture Content /%:
≤ 1.5
Fineness, Residue On 0.63 Mm Sieve /%:
≤ 5
Packaging Details:
Metal Barrel
Highlight:

cementitious crystalline coating waterproof

,

cementitious crystalline waterproofing coating

,

no lumps crystalline coating waterproof

Product Description
Cementitious Capillary Crystalline Waterproof Coating Manufacturer China
 
Substrate Preparation

Thoroughly clean the concrete substrate, remove laitance, dust, oil stains and loose peeling materials. Repair honeycombs, holes, wide cracks over 0.4mm and damaged areas. Fully wet the substrate to keep it moist, clean and solid. No standing water is allowed. Focus on cleaning and polishing details such as internal and external corners, construction joints and pipe roots.

Material Mixing

Mix according to the standard water-powder ratio, add water first then powder. Stir electrically for 2-3 minutes to form a smooth, lump-free slurry. Let it stand for maturation for 2-5 minutes and stir again before use. Prepare and use the slurry on demand, finish using within 20 minutes, and never re-stir with additional water.

Detail Reinforcement Treatment

For vulnerable leakage-prone parts such as construction joints, post-pouring belts, wall-penetrating pipes, corners and cracks, apply a thin coat of crystalline slurry as reinforcement first to fully cover the details. Proceed with large-area construction only after the reinforcement layer is completely dried and cured to eliminate leakage risks.

Large-area Coating Construction

Adopt brush coating or trowel coating for two cross-direction coats. Apply the first thin even coat, and apply the second cross coat vertically after the first coat is completely dry and non-sticky. Ensure uniform coating thickness with no missing coating or accumulation, and strictly control coating thickness and construction dosage.

 Moisture Curing (Core Procedure)

Start moisture curing immediately after the initial setting of the coating, and keep continuous water spraying curing for no less than 72 hours. Keep the coating moist during curing, avoid direct sunlight exposure, strong wind, frost and water scouring. Sufficient moisture activates the active crystallization of the material to ensure waterproof and impermeable effect.

Finished Product Protection & Subsequent Construction

No stepping, impact or scouring on the waterproof layer during curing. After the coating is fully cured and meets the standard, subsequent constructions such as plastering, mortar leveling, tile pasting and backfilling can be carried out directly without extra interface treatment. The construction ambient temperature shall be 5℃-35℃, and construction is prohibited in rainy and snowy weather.

 Technical Indexes

No. Test Item  Performance Requirement 
1 Appearance Uniform, no lumps
2 Moisture content /% ≤ 1.5
3 Fineness, residue on 0.63 mm sieve /% ≤ 5
4 Chloride ion content /% ≤ 0.10
5 Workability — after mixing with water Trowel-applicable without obstruction
5 Workability — 20 min Trowel-applicable without obstruction
6 Flexural strength /MPa, 28 d ≥ 2.8
7 Compressive strength /MPa, 28 d ≥ 15.0
8 Bond strength to damp substrate /MPa, 28 d ≥ 1.0

Cementitious Capillary Crystalline Waterproofing Coating Manufacturer China No Lumps

Related Products